Preparing for bathroom remodeling.

tiling is made ​​immediately after the pipe installation, the installation of the tub and door. If the bath panel is finished with ceramic tiles, this bath panel is sometimes equipped with doors that access to drain the bath water. But it is more advisable to swap the hole, using magnetic nabs a locks (quite strong and they are not less than four pieces of them ).

If there is bathroom equipment in the room already, it should be covered by cover sheets of paper, cardboard, etc. Swimming is usually covered with plywood (10-15 mm) or woodchip board, to preserve it from accidentally falling for this garbage as support for a bucket with adhesive solutions, tools, or tiles. If the floor is already tiled, it is necessary to cover it, too. It is better to have a wet cleaner with you to clean the dirty plates or arms.

weld size (between the plates) depends on the quality of the tiles (edge roughness), and aesthetic needs. Stitches are usually 1.5 to 3 mm wide, for a large ceramic tiles - 5 mm. Using the tile gap wedge helps maintain even spacing between tiles. Do not tile the entire wall in one day, as it should have time to strongly attached to the wall.

If you plan to use a variety of additional decorative details, such as borders and insert tiles with patterns, it is important to define its place on the wall. For finishing external and internal angles of a special plastic strip angle can be applied. They make the corners look more attractive. Flexible tape provides a perfect conformity with the wall or floor tiles. When you buy a plastic corner bars, they should be selected so that the slot size exceeds the thickness of the tiles.

Installation of new walls: brick, moisture-resistant gypsum plaster, concrete or foam. Schedule ventilation. Wire connections, water and sewer pipes look, replacing towel dryer (it is recommended that in parallel by-pass road have the option of emergency switching off the hot water main and set the ball valve lock in the event of failure). Set up a separate valve on hot water pipes, going to wash the dishes and containers. Installation of false ceiling with integrated lighting fitting. Waterproof coating. Plastering. Walls tiling. Install bath. Installation of bathroom equipment. Floor tiling. That's all. At this point, bathroom remodeling is completed.

for small bathrooms can be chosen specifically designed programs, mini bathroom equipment, take up less space. There is a special doll house effect, where everything seems larger than the reduced objects.

The work of quality criteria.

Tiles must be strictly tiled vertically, all of circuit blocks should be placed on the same level. Overlooking or sinking down one edge of the block along with the other is unacceptable. There should be a hollow space under the tile blocks. The spacing between the tiles should be the same everywhere. Stitches tiles should fit each other and form a straight line (exclusively at the level). Tile patterns should be matched. The spacing between the tiles should be properly grouted.